14 May 2012


Blog Update Time!

Sorry everyone I've been pretty slack and haven't been updating the blog.
Here is a heap of pictures of work done over the last month.




Double Front Doors Installed - still to varnished


Laundry cabinetry - bench top to be installed this week.


Toilet with small hand basin vanity.




Ensuite - stone bench tops installed


Bathroom - with stone bench top installed


Close up of undermounted sink



Dining room looking out to alfresco



Standing in the dining room looking back to the kitchen (when it's there!)



Standning in the kitchen looking to the left into the study. 


Bedroom 2 - WIR




Bedroom 3 - robe


Bed 4 - robe (painting still to be finished)


Verandah frame work up




The tiling started today in the wet areas.

Wood flooring will be delivered later this week. Which will be installed in a few weeks time.