A lot of work has gone into getting to this point. We are so happy to have completed Stage 1 of the build.
38 cubic metres of concrete got pumped into the slab today. That was for the actual house. The garage, verandah and alfresco are yet to be done.
Here are some photos:
House Pad minus the garage at the front and verandah along the side and alfresco at the back. |
The girls checking out the floor |
Now for the steel framing. M is going to be busy..... stay tuned, we hope to have walls soon!