Blog Update Time!
Sorry everyone I've been pretty slack and haven't been updating the blog.
Here is a heap of pictures of work done over the last month.
Double Front Doors Installed - still to varnished
Laundry cabinetry - bench top to be installed this week.
Toilet with small hand basin vanity.
Ensuite - stone bench tops installed
Bathroom - with stone bench top installed
Close up of undermounted sink
Dining room looking out to alfresco
Standing in the dining room looking back to the kitchen (when it's there!)
Standning in the kitchen looking to the left into the study.
Bedroom 2 - WIR
Bedroom 3 - robe
Bed 4 - robe (painting still to be finished)
Verandah frame work up
The tiling started today in the wet areas.
Wood flooring will be delivered later this week. Which will be installed in a few weeks time.